Section 36 Planning Documents

In April 2025, we submitted an application to the Scottish Ministers under Section 36 of the Electricity Act 1989 to convert Sloy into a pumped storage hydro scheme with a proposed pumping capacity of up to 100MW.

As part of our planning application, we are also including proposals to upgrade the existing 32.5MW G4 turbine to match its sister units, which would increase the station's generating output by 7.5MW to 160MW.

The Environmental Impact Assessment Report incorporates a robust assessment of the following environmental aspects:

  • Aquatic Ecology;
  • Terrestrial Ecology;
  • Ornithology;
  • Soils, Geology and the Water Environment;
  • Landscape and Visual Amenity;
  • Traffic and Transport;
  • Noise and Vibration;
  • Cultural Heritage;
  • Recreation.

You can view all of the documents that form the Section 36 application below:

Volume 2 - Figures

Volume 4 - Technical Appendices