Last week, damage was sustained to a single blade on an installed turbine at Dogger Bank A offshore wind farm. In line with safety procedures, the surrounding marine area has been restricted and relevant authorities notified. No one was injured or in the vicinity at the time the damage was sustained.
We are working closely with the turbine manufacturer, GE Vernova, which has initiated an investigation into the cause of the incident. Initial findings indicate that the circumstances surrounding the incident are isolated to the single blade affected.
Turbine installation has resumed, and other construction work on the wind farm continues.