Beatrice Offshore Wind Farm

The 84 turbine 588MW Beatrice offshore wind farm was completed in 2019.

Beatrice Offshore Wind Farm

Seagreen Wind Energy Ltd

The 114 turbine 1.075GW Seagreen Offshore Wind Farm is fully operational.

Seagreen Wind Energy Ltd

Griffin Wind Farm

The 68 turbine 156.4 MW Griffin Wind Farm was completed in 2012.

Griffin Wind Farm

Dogger Bank Wind Farm

The 277 turbine 3.6GW Dogger Bank offshore wind farm is under construction.

Dogger Bank Wind Farm

Greater Gabbard Offshore Wind Farm

The 140 turbine 504MW Greater Gabbard offshore wind farm was completed in 2012.

Greater Gabbard Offshore Wind Farm

Berwick Bank Offshore Wind Farm

The Berwick Bank offshore wind farm is currently in development.

Berwick Bank Offshore Wind Farm

North Falls Offshore Wind Farm

The North Falls Offshore Wind Farm project is in development.

North Falls Offshore Wind Farm

Arklow Bank Wind Park

The Arklow Bank Wind Park Phase 2 project is in development.

Arklow Bank Wind Park

Ossian Offshore Wind Farm

The Ossian Offshore Wind Farm is in development.

Ossian Offshore Wind Farm

Tangy Repower

The Tangy Repower project is a 16 turbine redevelopment of the existing Tangy Wind Farm, situated approximately 9km northwest of Campbeltown on the west coast of the Kintyre Peninsula in Argyll and Bute.

Tangy Repower

Viking Wind Farm

The Viking Wind Farm is an operational 103 turbine wind farm located on the Shetland Islands with a 443MW installed capacity.

Viking Wind Farm

Strathy South Wind Farm

The Strathy South wind farm is a consented 35 turbine project located around 12km south of Strathy village in Sutherland.

Strathy South Wind Farm

Cloiche Wind Farm

The proposed Cloiche wind farm is located adjacent to the operational Stronelairg wind farm. Click the arrow to find out more about the Cloiche project.

Cloiche Wind Farm

Yellow River Wind Farm

Yellow River is a 29 turbine 100MW wind farm under construction with completion expected in 2024.

Yellow River Wind Farm

Drumnahough Wind Farm

The proposed Drumnahough Wind Farm is located to in County Donegal. Click the arrow to find out more about the Drumnahough project.

Drumnahough Wind Farm

Lenalea Wind Farm

Lenalea is an operational 7 turbine wind farm in the rural upland setting of County Donegal. Click to find out more about Lenalea.

Lenalea Wind Farm

Cassley Power Station

The Cassley Power Station is part of the Shin Hydro Scheme

Cassley Power Station

Duchally Power Station

The Duchally Power Station is part of the Shin Hydro Scheme

Duchally Power Station

Shin Power Station

The Shin Power Station is part of the Shin Hydro Scheme.

Shin Power Station

Grudie Bridge Power Station

The Grudie Bridge Power Station is part of the Conon Hydro Scheme.

Grudie Bridge Power Station

Achanalt Power Station

The Achanalt Power Station is part of the Conon Hydro Scheme

Achanalt Power Station

Luichart Power Station

The Luichart Power Station is part of the Conon Hydro Scheme.

Luichart Power Station

Lairg Power Station

The Lairg Power Station is part of the Shin Hydro Scheme.

Lairg Power Station

Culligran Power Station

The Culligran Power Station is part of the Affric/Beauly Hydro Scheme.

Culligran Power Station

Deanie Power Station

The Deanie Power Station is a part of the Affric/Beauly Hydro Scheme.

Deanie Power Station

Aigas Power Station

The Aigas Power Station is part of the Affric/Beauly Hydro Scheme.

Aigas Power Station

Kilmorack Power Station

The Kilmorack Power Station is part of the Affric/Beauly Hydro Scheme.

Kilmorack Power Station

Mullardoch Power Station

The Mullardoch Power Station is part of the Affric/Beauly Hydro Scheme.

Mullardoch Power Station

Fasnakyle Power Station

The Fasnakyle Power Station is part of the Affric/Beauly Hydro Scheme.

Fasnakyle Power Station

Quoich Power Station

The Quoich Power Station is part of the Great Glen Hydro Scheme.

Quoich Power Station

Invergarry Power Station

The Invergarry Power Station is part of the Great Glen Hydro Scheme.

Invergarry Power Station

Tummel Power Station

The Tummel Power Station is part of the Tummel Valley Hydro Scheme.

Tummel Power Station

Rannoch Power Station

The Rannoch Power Station is part of the Tummel Valley Hydro Scheme.

Rannoch Power Station

Pitlochry Power Station

The Pitlochry Power Station is part of the Tummel Valley Hydro Scheme and also home to the Pitlochry Dam Visitor Centre.

Pitlochry Power Station

Clunie Power Station

The Clunie Power Station is part of the Tummel Valley Hydro Scheme.

Clunie Power Station

Pitlochry Dam Visitor Centre

The Pitlochry Visitor Centre is located adjacent to the Pitlochry Hydro Power Station, part of the Tummel Valley Hydro Scheme.

Pitlochry Dam Visitor Centre

Errochty Power Station

The Errochty Power Station is part of the Tummel Valley Hydro Scheme.

Errochty Power Station

Trinafour Power Station

The Trinafour Power Station is part of the Tummel Valley Hydro Scheme.

Trinafour Power Station

Livishie Power Station

The Livishie Power Station is part of the Great Glen Hydro Scheme.

Glenmoriston Hydro Station

The Glenmoriston Power Station is part of the Great Glen Hydro Scheme.

Glenmoriston Hydro Station

Sloy Power Station

The Sloy Power Station is part of the Sloy/Awe Hydro Scheme.

Sloy Power Station

Inverawe Power Station

The Inverawe Power Station is part of the Sloy/Awe Hydro Scheme.

Inverawe Power Station

Nant Power Station

The Nant Power Station is part of the Sloy/Awe Power Station.

Nant Power Station

Lochay Power Station

The Lochay Power Station is part of the Breadalbane Hydro Scheme.

Lochay Power Station

Cashlie Power Station

The Cashlie Power Station is part of the Breadalbane Hydro Scheme.

Cashlie Power Station

Finlarig Power Station

The Finlarig Power Station is part of the Breadalbane Hydro Scheme.

Finlarig Power Station

Sron Mor Power Station

The Sron Mor Power Station is part of the Sloy/Awe Hydro Scheme.

Sron Mor Power Station

Loch Ericht Power Station

The Loch Ericht Power Station is part of the Tummel Valley Hydro Scheme.

Loch Ericht Power Station

Nostie Bridge Power Station

The Nostie Bridge Power Station is part of the Great Glen Hydro Scheme.

Nostie Bridge Power Station

Morar Power Station

The Morar Power Station is part of the Great Glen Hydro Scheme.

Morar Power Station

Kerry Falls Power Station

The Kerry Falls Power Station is part of the Conon Hydro Scheme.

Kerry Falls Power Station

Striven Power Station

The Striven Power Station is part of the Sloy/Awe Hydro Scheme.

Striven Power Station

Lussa Power Station

The Lussa Power Station is part of the Sloy/Awe Hydro Scheme.

Lussa Power Station

Storr Lochs Power Station

The Storr Lochs Power Station is part of the Great Glen Hydro Scheme.

Storr Lochs Power Station

Gaur Power Station

The Gaur Power Station is part of the Tummel Valley Power Station.

Gaur Power Station

Loch Dubh Power Station

The Loch Dubh Power Station is part of the Conon Hydro Scheme.

Loch Dubh Power Station

Ceannacroc Power Station

The Ceannacroc Power Station is part of the Great Glen Hydro Scheme.

Ceannacroc Power Station

Kilmelford Power Station

The Kilmelford Power Station is part of the Sloy/Awe Hydro Scheme.

Kilmelford Power Station

Allt Na Lairige Power Station

The Allt Na Lairige Power Station is part of the Sloy/Awe Hydro Scheme.

Allt Na Lairige Power Station

Clachan Power Station

Clachan Power Station is part of the Sloy/Awe Hydro Scheme.

Clachan Power Station

Mossford Power Station

Mossford Power Station is part of the Conon Hydro Scheme.

Mossford Power Station

Vaich Power Station

Vaich Power Station is part of the Conon Hydro Scheme.

Vaich Power Station

Dalchonzie Power Station

Dalchonzie Power Station is part of the Breadalbane Hydro Scheme.

Dalchonzie Power Station

Lubreoch Power Station

Lubreoch Power Station is part of the Breadalbane Hydro Scheme.

Lubreoch Power Station

Lednock Power Station

Lednock Power Station is part of the Breadalbane Hydro Scheme.

Lednock Power Station

St Fillans Power Station

St Fillans Power Station is part of the Breadalbane Hydro Scheme.

St Fillans Power Station

Chliostair Power Station

Chliostair Power Station is part of the Conon Hydro Scheme.

Chliostair Power Station

Loch Gair Power Station

Loch Gair Power Station is part of the Sloy/Awe Hydro Scheme.

Loch Gair Power Station

Mucomir Power Station

Mucomir Power Station is part of the Great Glen Hydro Scheme.

Mucomir Power Station

Foyers Falls Power Station

Foyers Falls Power Station is part of the Foyers Hydro Scheme.

Foyers Falls Power Station

Foyers Pump Storage Power Station

The Foyers 300 MW Pump Storage Power Station is part of the Foyers Hydro Scheme.

Claddoch Power Station

Claddoch Power Station is part of the Sloy/Awe Hydro Scheme.

Claddoch Power Station

Cuileig Power Station

Cuileig Power Station is part of the Shin Hydro Scheme.

Cuileig Power Station

Glendoe Power Station

Glendoe Power Station is part of the Foyers Hydro Scheme.

Glendoe Power Station

Kingairloch Power Station

Kingairloch Power Station is part of the Great Glen Hydro Scheme.

Kingairloch Power Station

Orrin Power Station

Orrin Power Station is part of the Conon Hydro Scheme.

Orrin Power Station

Torr Achilty Power Station

Torr Achilty Power Station is part of the Conon Hydro Scheme.

Torr Achilty Power Station

Gisla Power Station

Gisla Power Station is part of the Conon Hydro Scheme.

Gisla Power Station

Loyne Power Station

Loyne Power Station is part of the Great Glen Hydro Scheme.

Loyne Power Station

Misgeach Power Station

Misgeach Power Station is part of the Affric/Beauly Hydro Scheme.

Misgeach Power Station

Falls of Lochay Power Station

Falls of Lochay Power Station is part of the Breadalbane Hydro Scheme.

Falls of Lochay Power Station

Cuaich Power Station

Cuaich Power Station is part of the Tummel Valley Hydro Scheme.

Cuaich Power Station

Coire Glas

The Coire Glas pumped hydro project is located on the shores of Loch Lochy in the Scottish Highlands, between Fort William and Inverness and has a potential capacity of up to 1500MW

Ferrybridge BESS

Ferrybridge is a legacy SSE coal power station which was closed in 2016. SSE Renewables are developing a 150MW / 300MWh battery energy storage system (BESS) site on the land in West Yorkshire.

Ferrybridge BESS

Fiddler's Ferry BESS

Located on the site of a former SSE owned coal power station, we have a 150MW / 300MWh battery energy storage system (BESS) project under development in the Fiddler's Ferry near Warrington, Cheshire.

Fiddler's Ferry BESS

Littleton Solar

This 31MW solar farm project in Evesham, Worcestershire is our first solar project and is in construction. The 77-acre site, which SSE Renewables acquired from Stark in December 2021, will be capable of powering 10,000 homes when fully operational.

Littleton Solar

Salisbury BESS

Our first battery storage project in Salisbury, Wiltshire, is operational. The 50MW / 100MWH battery energy storage system (BESS) project was developed in conjunction with Wartsila and construction began in December 2022.

Salisbury BESS

Monk Fryston BESS

The Monk Fryston BESS project (320MW / 640MWh) is due to go into construction. It is located outside the North Yorkshire village of Monk Fryston.

Monk Fryston BESS

Bypass Solar

The Bypass Solar project is about to go in to construction, located to the south of the village of Foston in Lincolnshire.

Bypass Solar

Staythorpe BESS

The Staythorpe Battery project is in planning, located to the west of the village of Averham, near Newark.

Staythorpe BESS

Muskham Solar

We are developing two separate but adjacent proposed Solar sites. 'Muskham' is South East of the small village of Knapthorpe near Newark on Trent. The 'Knapthorpe' site sites to the north of the village bordering close to the A616.

Muskham Solar

Knapthorpe Solar

We are developing two separate but adjacent proposed Solar sites. 'Muskham' is South East of the small village of Knapthorpe near Newark on Trent. The 'Knapthorpe' site sites to the north of the village bordering close to the A616.

Knapthorpe Solar

Calliachar

The 14 turbine 32.2MW Calliachar wind farm was completed in 2012.

Calliachar

Achany Wind Farm

The 19 turbine 38MW Achany wind farm was completed in 2010.

Achany Wind Farm

Artfield Fell Wind Farm

The 15 turbine 19.5MW Artfield Fell wind farm was completed in July 2005.

Artfield Fell Wind Farm

Balmurrie Fell

The seven turbine 9.1MW Balmurrie Fell wind farm was completed in September 2012.

Balmurrie Fell

Bhlaraidh wind farm

The 32 turbine 108MW Bhlaraidh wind farm was completed in August 2017.

Bhlaraidh wind farm

Clyde Wind Farm

The 206 turbine 522MW Clyde wind farm is one of Europe's largest onshore wind farms.

Clyde Wind Farm

Drumderg Wind Farm

The 16 turbine 36.8MW Drumderg wind farm was completed in 2008.

Drumderg Wind Farm

Dunmaglass Wind Farm

The 33 turbine 94.05MW Dunmaglass Wind Farm was completed in 2017,

Dunmaglass Wind Farm

Fairburn Wind Farm

The 20 turbine 40MW Fairburn Wind Farm was completed in February 2010.

Fairburn Wind Farm

Gordonbush Wind Farm

The 35 turbine 71.75MW Gordonbush Wind Farm was completed in June 2012.

Gordonbush Wind Farm

Gordonbush Extension Wind Farm

The 11 turbine 38MW Gordonbush Extension Wind Farm was completed in 2021.

Gordonbush Extension Wind Farm

Hadyard Hill Wind Farm

The 51 turbine 117.3MW Hadyard Hill Wind Farm was completed in 2006.

Hadyard Hill Wind Farm

Keadby Wind Farm

The 34 turbine 68MW Keadby Wind Farm was completed in 2014.

Keadby Wind Farm

Spurness Wind Farm

The five turbine 10MW Spurness Wind Farm was completed in October 2012.

Spurness Wind Farm

Strathy North Wind Farm

The 33 turbine 67.65MW Strathy North Wind Farm was completed in June 2015.

Strathy North Wind Farm

Stronelairg Wind Farm

The 66 turbine 228MW Stronelairg Wind Farm was completed in December 2018.

Stronelairg Wind Farm

Tangy Wind Farm

The 22 turbine 18.7MW Tangy Wind Farm (comprising two phases) was completed in 2003/2007.

Tangy Wind Farm

Toddleburn Wind Farm

The 12 turbine 27.6MW Toddleburn Wind Farm was completed in 2010.

Toddleburn Wind Farm

Athea Wind Farm

The 16 turbine 34MW Athea wind farm was completed in 2014.

Athea Wind Farm

Bindoo Wind Farm

The 32 turbine 48MW Bindoo Wind Farm was completed in 2007.

Bindoo Wind Farm

Coomacheo Wind Farm

The 18 turbine 41.4MW Coomacheo Wind Farm was completed in 2008.

Coomacheo Wind Farm

Coomatallin Wind Farm

The four turbine 6MW Coomatallin Wind Farm was completed in 2005.

Coomatallin Wind Farm

Corneen Wind Farm

The two turbine 3MW Corneen Wind Farm was completed in 2001.

Corneen Wind Farm

Culliagh Wind Farm

The 18 turbine 11.9MW Culliagh Wind Farm was completed in 2000.

Culliagh Wind Farm

Curragh Wind Farm

The eight turbine 18.4MW Curragh Wind Farm was completed in 2009.

Curragh Wind Farm

Dromada Wind Farm

The 19 turbine 28.5MW Dromada Wind Farm was completed in 2010.

Dromada Wind Farm

Dunneill Wind Farm

The 13 turbine 11.1MW Dunneill Wind Farm was completed in 2010.

Dunneill Wind Farm

Galway Wind Park

The 58 turbine 174MW Galway Wind Park was completed in 2017.

Galway Wind Park

Gartnaneane Wind Farm

The 10 turbine 15MW Gartnaneane Wind Farm was completed in 2004.

Gartnaneane Wind Farm

Kingsmountain Wind Farm

The 10 turbine 25MW Kingsmountain Wind Farm was completed in 2003.

Kingsmountain Wind Farm

Knockastanna Wind Farm

The four turbine 6MW Knockastanna Wind Farm was completed in 2009.

Knockastanna Wind Farm

Leanamore Wind Farm

The nine turbine 18MW Leanamore Wind Farm was completed in 2018.

Leanamore Wind Farm

Meentycat Wind Farm

The 45 turbine 88.5MW Meentycat Wind Farm was completed in 2004.

Meentycat Wind Farm

Mullananalt Wind Farm

The 5 turbine 7.5MW Mullananalt Wind Farm was completed in 2007.

Mullananalt Wind Farm

Rathcahill Wind Farm

The five turbine 12.5MW Rathcahill Wind Farm was completed in 2011.

Rathcahill Wind Farm

Richfield Wind Farm

The 18 turbine 27MW Richfield Wind Farm was completed in 2006.

Richfield Wind Farm

Richfield Solar and BESS

SSE Renewables is proposing to develop a c21MWp solar PV array and c.10MW/2hr battery energy storage system on lands near the Richfield Wind Farm.

Richfield Solar and BESS

Tournafulla Wind Farm

The 18 turbine 27MW Tournafulla Wind Farm was completed in 2008.

Tournafulla Wind Farm

Bessy Bell 2 Wind Farm

The 6 turbine 9MW Bessy Bell 2 Wind Farm was completed in 2008.

Bessy Bell 2 Wind Farm

Slieve Kirk Wind Park

The 32 turbine 73MW Slieve Kirk Wind Park, built in two phases, was completed in 2012 and 2014.

Slieve Kirk Wind Park

Tievenameenta Wind Farm

The 15 turbine 34.5MW Tievenameenta Wind Farm was completed in 2017.

Tievenameenta Wind Farm

Achany Wind Farm Extension

The proposed Achany Extension Wind Farm (formerly known as Glencassley) would be constructed on land adjacent to the operational Achany Wind Farm. Please click to find out more about the proposal.

Achany Wind Farm Extension

Bhlaraidh Extension Wind Farm

SSE Renewables has been awarded consent to construct an up to 18 turbine extension to the existing Bhlaraidh Wind Farm. Please click to find out more about the Extension project.

Bhlaraidh Extension Wind Farm

Aberarder Wind Farm

The Aberarder Wind Farm project is located in Strathnairn near Inverness, on a natural plateau at an average of 700m above sea level. It will sit directly adjacent to the operational 94MW Dunmaglass Wind Farm.

Aberarder Wind Farm

Brown Rig Wind Farm

We are assessing the potential for the development of a wind farm at Brown Rig, near Crosslee in the Scottish Borders.

Brown Rig Wind Farm

Glentarken Wind Farm

We are assessing the potential for development of a wind farm on the Drummond Estate, located between St Fillans and Lochearnhead in Perthshire.

Glentarken Wind Farm

Fairburn Extension Wind Farm

We are assessing the potential for an extension to Fairburn wind farm, near Marybank in the Highlands.

Fairburn Extension Wind Farm

High Dalrioch Wind Farm

We are assessing the potential for development of a wind farm at High Dalrioch, near Campbeltown in Argyll and Bute.

High Dalrioch Wind Farm

Seagreen1A

The Seagreen1A wind farm is in development and will add up to 36 turbines to the adjacent operational Seagreen wind farm.

Seagreen1A

Eggborough BESS

Eggborough is a proposed battery energy storage system (BESS) based on land north of the village of Eggborough and east of Kellington.

Eggborough BESS

Daines BESS

Daines is a proposed battery energy storage system (BESS) situated in Carrington, Greater Manchester. SSE Renewables is currently assessing the potential for the development of the site.

Daines BESS

Crumhach

Find out more about our plans here

Crumhach

Tattymoyle

We are proposing to develop a wind farm near Fintona, Co. Tyrone comprising up to 10 turbines generating up to 60MW.

Tattymoyle

Foxholes Solar Project

The proposed up to 49.9MW Foxholes solar farm is located on land to the southeast of the village of Norwell (Nottinghamshire).

Foxholes Solar Project

Derrymeen BESS

The Derrymeen Battery Storage Project will be located near Dungannon in Northern Ireland.

Derrymeen BESS

Thornsberry BESS

Thornsberry BESS is a battery storage project in the townlands of Derrynagall and Ballydaly near Tullamore in Co. Offaly, Ireland.

Thornsberry BESS

Tarbert BESS

We are seeking to deploy a battery energy storage system at the site of the old Tarbert Power Station in North Kerry, Ireland.

Tarbert BESS

Chaintrix-Bierges and Vélye

We’re building the 28MW Chaintrix-Bierges and Vélye Wind Farm in the northeast of France.

Chaintrix-Bierges and Vélye

Jubera Wind Farm

We’re building the 64MW Jubera Wind Farm in the La Rioja region of Spain.

Jubera Wind Farm